Capacity: | 1000L, 2000L | Temperature Range: | 15~65 ℃ |
---|---|---|---|
Humidity Range (%R.H): | 15~95 | Refrigeration Compressor Units: | 1 Backup Unit |
High Light: | Bonnin accelerated stability chamber,2000L drug test chamber,630kg pharmaceutical stability test chambers |
Pharmaceutical Stability Chambers Drug Stability Test Chamber Accelerated Testing
Pharmaceutical stability test chambers is used for companies to test drugs and calibration and stability tests for new drugs. Pharmaceutical stability chambers to meet the accelerated test, the test of long-term and high-humidity test, international organizations to identify new ICH stability testing conditions are also among the above range. Users can also press the unit Drug stability test chamber to arrange work requirements.
The operating power is measured at 40℃ and 75%R.H with one refrigeration compressor running.
Air conditioning and Refrigeration system
*Forced-ventilated blower system generates gentle and evenly distributed airflow across all shelves
*Electric heating system
*Responsive vapor humidification
*Automatic circulating water supply system (use purified water or distilled water)
*Cooling system through multiple heat-resistant refrigeration compressor units(1 backup unit)
Main technical datas:
Model | LHH-1000SD-2T | LHH-2000SD-2T |
Temperature range (℃) | 15~65 | 15~65 |
Temperature fluctuation (℃) | ±0.5 | ±0.5 |
Temperature deviation (℃) | ±1 | ±1 |
Humidity range (%R.H) | 15~95 | 15~95 |
Humidity deviation (%R.H) | ±3 | ±3 |
Power supply(V/Hz) | 220/50 | 220/50 |
Installed power(W) | 3000 | 4500 |
Operating power(W) | About 1000 | About 1500 |
Shelf(Set) | 5 | 7 |
Internal dimension D x W x H(mm) | 950×850×1200 | 1200×1100×1500 |
External dimension D x W x H(mm) | 1550×1080×1870 | 1880×1330×2170 |
Net weight(kg) | 410 | 630 |
FAQ 1. Are you a factory or trading company?
We are a factory.
FAQ 2. Can you supply OEM?
OEM is available.
FAQ 3. What's the MOQ ?
(1). MOQ is 1 piece. The disposable supplies order usually at least 1 box.
FAQ 4. How about the order processing and lead time?
After order confirmation and receive the advance payment, we will prepare the machines and goods. Usually could ready within 10 working day, when dispatch, will inform client and send the documents for client making import customs clearance.
FAQ 5. What quality will be ensured?
100% new and quality inspection before delivery from factory.
Stable export box for good package.
FAQ 6. Can you guide the working?
The machine will deliver with English display, English manual and video for installation and operation.
FAQ 7. How can your engineer replace parts if they are not beside the machine?
Bonnin’s engineer could provide the solutions by email and video. In warranty period, we can send spare parts for free and life-time technical support for spare supply.