Freeze-drying Area: | 1m2~200m2 | Liquid Material: | 10L ~200L |
---|---|---|---|
Shelf Numbers: | 7+1 | Cold Trap Temperature: | ≤-75℃ (no-loading) |
Display: | English Touch Screen | Power: | 3Ph+N+PE, 380V |
Highlight: | LG-1 Food freeze dryer machine,3P freeze dried fruit machine,fruit freeze dryer machine LG-5 |
LG-1 LG-5 Food Fruits Vacuum Freeze Drying Machine Large Capacity Vacuum Freeze Dryer
Applications
Main features:
1. Pre-freezing and drying separated structure
2. Aerospace grade aluminum alloy shelf material
3. High efficiency mixed refrigerant medium
4. The patent gas diversion 3D design and control technology
5. Trays are made by aviation rust proof aluminum alloy
6. Industrial embedded touch screen+dedicated SH-HPSC-III modular controller
7. Specially desingned FD-MANAGER control system
8. Flexible manual+automatic control mode
9. Accurate sensor calibration functions ensures long-term reliability and stability of process parameter
10. User level and password can be setted
Main technical datas:
Model
|
Freeze drying area
|
Shipping weight
|
Shelf Dimension
|
Cold trap temp.
|
Ultimate Vacuum
|
Ice Collecting Capacity
|
Temp. range
|
LG-1
|
1m2
|
10kg
|
400*625mm, 4+1 layers
|
≤-60 ℃
|
≤5 Pa
|
≥15kg/batch
|
room temp.~+100℃
|
LG-5
|
5m2
|
50kg
|
600*1200mm, 7+1 layers
|
≤-50℃
|
≥75kg/batch
|
||
LG-10
|
10m2
|
100kg
|
1000*1120mm, 9+1 layers
|
≤-65℃
|
≥150kg/batch
|
||
LG-15
|
16.2m2
|
150kg
|
1200*1500*15mm, 9+1 layers
|
≤-60℃
|
≥225kg/batch
|
normal temp.~120℃
|
|
LG-20
|
20.6m2
|
200kg
|
1200*2150*15mm, 8+1 layers
|
≥300kg/batch
|
|||
LG-30
|
31.68m2
|
300kg
|
1200*3300*15mm, 8+1 layers
|
≥450kg/batch
|
|||
LG-50
|
52.92m2
|
500kg
|
4900*1200*15mm, 9+1 layers
|
≤-50℃
|
<10 Pa
|
≥750kg/batch
|
|
LG-100
|
105.84m2
|
1000kg
|
4900*1200*15mm, 18+1 layers
|
≥1500kg/batch
|
|||
LG-200
|
209.52m2
|
2000kg
|
9700*1200*15mm, 18+1 layers
|
≥3000kg/batch
|
FAQ 1. Are you a factory or trading company?
We are a factory.
FAQ 2. Can you supply OEM?
OEM is available.
FAQ 3. What's the MOQ ?
(1). MOQ is 1 piece. The disposable supplies order usually at least 1 box.
FAQ 4. How about the order processing and lead time?
After order confirmation and receive the advance payment, we will prepare the machines and goods. Usually could ready within 10 working day, when dispatch, will inform client and send the documents for client making import customs clearance.
FAQ 5. What quality will be ensured?
100% new and quality inspection before delivery from factory.
Stable export box for good package.
FAQ 6. Can you guide the working?
The machine will deliver with English display, English manual and video for installation and operation.
FAQ 7. How can your engineer replace parts if they are not beside the machine?
Bonnin’s engineer could provide the solutions by email and video. In warranty period, we can send spare parts for free and life-time technical support for spare supply.