Maximum Temperature In The Central Area: | 825℃±50℃ | Maximum Sanitized Items: | 35mm, 14mm |
---|---|---|---|
Test Duration: | 3-8min | Pressure Range: | 500-3000Pa |
Highlight: | 35mm infrared loop sterilizer,lab infrared sterilizer,inoculating loop sterilizer Large Diameter |
Infrared Inoculation Loop Sterilizer Apparatus, Large Diameter Infrared Heat Sterilizer
Applicable fields:
The infrared inoculation sterilizer adopts infrared heat sterilization. Because of its convenient use, simple operation, no open flame, it can effectively prevent cross-contamination and be safe to use. It can be widely used in biological safety cabinets, purification workbenches, beside exhaust fans, mobile vehicles and other environments to conduct microbial experiments.
Features:
The inoculation loop inoculation needle is sterilized and sterilized, which is safe and convenient, and completely replaces the alcohol lamp. The temperature in the heating hole can reach more than 800 ℃, and the sterilization only takes 5-7 seconds. Small size, light weight, easy to operate, the main body of the instrument is stainless steel, beautiful and clean, and can be used in an anaerobic environment. Ashes organic matter in the central zone. Prevents infectious splash and cross-contamination.
Technical datas:
Model | MH-3000B | MH-3000C | MH-3000D |
Maximum temperature in the central area | 825℃±50℃ | 850℃±50℃ | 820℃±50℃ |
Maximum sanitized items | 35mm | 14mm | 35mm |
The total length of the heating area | 100mm | 150mm | 110mm |
Dimensions | 162×98×192mm | 160×110×230mm | 150×110×240mm |
power | 195W | 170W | 400W |
weight | 1.4KG | 1.15KG | 1.15KG |
fuse | 250V 3A 5x20 | 250V 3A 5x20 | 250V 3A 5x20 |
Heating time to maximum temperature | 20min | 20min | 20min |
Input voltage | AC220V 50-60HZ | AC220V 50-60HZ | AC220V 50-60HZ |
FAQ 1. Are you a factory or trading company?
We are a factory.
FAQ 2. Can you supply OEM?
OEM is available.
FAQ 3. What's the MOQ ?
(1). MOQ is 1 piece. The disposable supplies order usually at least 1 box.
FAQ 4. How about the order processing and lead time?
After order confirmation and receive the advance payment, we will prepare the machines and goods. Usually could ready within 10 working day, when dispatch, will inform client and send the documents for client making import customs clearance.
FAQ 5. What quality will be ensured?
100% new and quality inspection before delivery from factory.
Stable export box for good package.
FAQ 6. Can you guide the working?
The machine will deliver with English display, English manual and video for installation and operation.
FAQ 7. How can your engineer replace parts if they are not beside the machine?
Bonnin’s engineer could provide the solutions by email and video. In warranty period, we can send spare parts for free and life-time technical support for spare supply.